Mechanical Permit Fees

Permit Fees

Initial Fee

For issuing each permit    

$10.00

Additional Fees

Fee for inspecting heating, ventilating, ductwork, air conditioning and refrigeration systems for the first $1,000.00 in value or fraction thereof, plus a fee of $2.00 for each additional $1,000.00 in value or fraction thereof.

$10.00
Fee for inspecting repairs, alteration and additions to an existing system up to $1,000.00 in value, plus a fee of $2.00 for each additional $1,000.00 in value, or fraction thereof. $5.00

Fee for inspecting boilers (based upon BTU input):

    33,000 BTU (1 BHp) to 165,000 (5 BHp)

    165,001 BTU (5 BHp) to 330,000 (10 BHp)

    330,001 BTU (10 BHp) to 1,165,000 (52 BHp)

    1,165,001 BTU (52 BHp) to 3,300,000 (98 BHp)

    over 3,300,000 BTU (98 BHp) 

 

$5.00

10.00

15.00

25.00

35.00

Fee For Re-inspection

In case it becomes necessary to make a re-inspection of  a heating, ventilation, air conditioning or refrigeration system, or boiler installation, the installer of such equipment shall pay a re-inspection fee of $5.00.

Temporary Operation Inspection Fee

When preliminary inspection is requested for purposes of permitting temporary operation of a heating, ventilating, refrigeration, or air conditioning system, or portion thereof, a fee of $5.00 shall be paid by the contractor requesting such preliminary inspection.  If the system is not approved for temporary operation on the first preliminary inspection, the usual re-inspection fee shall be charged for each subsequent preliminary inspection for such purpose.

Self Contained Units Less Than Two Tons

In all buildings, except one and two family dwellings, where self-contained air conditioning units of less than two tons are to be installed, the fee charged shall be that for the total cost of all units combined (see B101.2.1 for rates).